Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 5 —

Step Type:

Drag to rearrange

Lay the printer left side down on some blocks.

It's important that this panel goes on the side with the single Z tower. Note the position of the hole for the cables to pass through.

The "textured" side of the HDPE panel should face out, shiny side in.

Install the Right panel using (20) M3 Nylock Nuts, in the same method as before. Do not fully tighten the nuts yet.

For the ZLT you'll need (24) M3 Nylock Nuts total.

Your contributions are licensed under the open source Creative Commons license.