Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 4 —

Step Type:

Drag to rearrange

Prep the Z axis MGN12 linear rails in the same fashion as the X axis rails. There are additional hex head bolts in the ZLT supplement bag. These can be merged in with the rest of your hardware.

Select 4 evenly spaced holes in the rail. Place a lock washer on (1) M3 x 8mm Socket Head Cap Screw, and place it into the rail. Loosely thread on (1) M3 nut to the bolt.

For the ZLT you should use (8) bolts spaced evenly, instead of (4) per rail. Extra 8mm bolts are located in the ZLT supplemental hardware bag.

Repeat for all (3) Z linear rails.

It is highly recommended to use a bit of masking tape to keep the carriage from sliding off of the linear rail.

Your contributions are licensed under the open source Creative Commons license.