Skip to main content

Changes to Step #6

Edit by Ben Withem

Edit approved by Ben Withem

Before
After
Unchanged

Step Lines

[title] Add Hardware to Top Front and Top Back Extrusions
[* black] (8) M3 nuts go in the top channel of the back extrusion.
[* black] (8) M3 nuts go in the front channel of the front extrusion.
-[* black] Insert the acrylic spacer inserts and M3 nuts in the top outer channel. There should be 2x 5mm spacers, 3x 81mm spacers, and 4 M3 nuts (See second image for reference).
-[* black] Insert the acrylic spacer inserts and M3 nuts in the front outer channel. There should be 2x 5mm spacers, 3x 81mm spacers, and 4 M3 nuts (See second image for reference).
+[* black] Insert the acrylic spacer inserts and M3 nuts in the top outer channel. There should be (2) 5mm spacers, (3) 81mm spacers, and 4 M3 nuts (See second image for reference).
+[* black] Insert the acrylic spacer inserts and M3 nuts in the front outer channel. There should be (2) 5mm spacers, (3) 81mm spacers, and 4 M3 nuts (See second image for reference).